Case study : SITEC of Bastia
SITEC is composed of two buildings, one of which of 500m2 is entirely dedicated to its offices. The architectural diversity of this building mixing individual offices and collaborative spaces lends itself to energy optimization. We have installed Agrid-Link in 2021 to help them in their desire to reduce their energy waste .
The installation at Sitec took just over half an hour, and for good reason: rats had attacked the network cables! Nevertheless, in less than a day, we were able to install our system.
The Agrid system has been installed since November 2021 and has been running continuously since that day.
"The collaboration with AGRID was an obvious choice for us because the solution that it proposes perfectly matches the ambition of environmental excellence that SITEC aims at. Reducing the energy consumption allows us to reduce the carbon impact of our company but also to realize very important savings which are at the heart of our economic model. Even if we still have little hindsight, the user experience is already very satisfactory and the product is necessarily in constant improvement. Given our field of activity, we were very sensitive to this innovative technical solution with very high potential."